Assessment of the CP Solutions in the 
Pulp and Paper Sector, April 2001

DescriptionDownloadRelated Information

Description

Over the past three years, methodologies to conduct Cleaner Production audits were developed in the context of the China Canada Co-operation Project in Cleaner Production. These methodologies were developed primarily as a result of CP auditing and implementation work done in the Anhui Paper Mill (the demonstration project). Upon completion of the demonstration project, the workplan called for project extension activities to other paper mills in Anhui Province. In total six mills were selected, namely Ma An Shan-Shan Ying mill, Tian Du mill, Jin Zhong mill, Chao Lun mill, Lu An mill, and Gao Sen mill. These six plants represent 47% of the pulp and paper production of Anhui Province.

This report documents the results of missions in January and March 2001, whose purpose was to validate the Cleaner Production solutions that were claimed to have been implemented at the selected mills. During the course of these two missions, it was not possible to assess implementation of all CP solutions identified by each mill. Instead, a representative sample of CP solutions was chosen for audit purposes. Only CP solutions having significant environmental and economical benefits were audited.

The full report, available in downloadable .pdf format below, contains a detailed section on each of the six mills, including 

  • Introduction to the mill

  • CP solutions already implemented, with measurements of environmental benefits

  • CP solutions to be implemented

  • Summaries of CP solutions in table format, in order by cost

The appendices, which follow the report, contain supplementary information.

  • Appendix A - Attendance Lists and Schedules of the Visits

  • Appendix B - Operational Costs and Selling Prices

  • Appendix C - Audited CP Solutions Photos

  • Appendix D - Savings Resulting from the Implementation of CP Solutions

  • Appendix E - Reports Provided by the Selected Mills (Title pages only, as each report is in Chinese)

Download

The report is in PDF format (you will need a copy of Acrobat Reader) - for comments or more information about the report please contact Mark Osterman. To view a file with Acrobat Reader, click the linked file name below. To save a file without first viewing it, use a right (or secondary) mouse click, then 'Save Link As.'

Title of Section File Name Size
Assessment of CP Solutions Report cp_assess_p_p.pdf 41 pages, 116K
Appendix A - Attendance Lists and Schedules of the Visits cp_apdx_a.pdf 7 pages, 13K
Appendix B - Operational Costs and Selling Prices cp_apdx_b.pdf 3 pages, 10K
Appendix C - Audited CP Solutions Photos
   Ma An Shan Ying Mill Photos cp_apdx_c-1.pdf 2 pages, 100K
   Tiandu Mill Photos cp_apdx_c-2.pdf 3 pages, 152K
   Jin Zhong Mill Photos cp_apdx_c-3.pdf 3 pages, 138K
   Chao Lun Mill Photos cp_apdx_c-4.pdf 3 pages, 164K
   Lu An Mill Photos cp_apdx_c-5.pdf 4 pages, 203K
   Gao Sen Mill Photos cp_apdx_c-6.pdf 4 pages, 178K
Appendix D - Savings Resulting from the Implementation of CP Solutions cp_apdx_d.pdf 3 pages, 11K
Appendix E - Reports Provided by the Selected Mills (Title pages only, as each report is in Chinese) cp_apdx_e.pdf 7 pages, 112K
Contact information for the Mills cp_assess_contact.pdf 2 pages, 6K

Related Information

[ Project Home | Project Description | Project Implementation ]
 [
Project Participants | Project Map | Training ]
[
Gender Equality Strategy | Work Plans | Case Studies | Newsletters ]

Go to top

ŠNDRC 2000-2006